I got a rare day off today so thought I would work on control panel 2. I was having coffee with the wife before she left for work ( I am going some where with this, bear with me ) she said I ought to just put the control panel at the opposite end of the tank stand from where I put the other control panel. I had thought about that, but knew there was a reason I didn't want to do that, I couldn't think of the reason at the time, decided that the reason was because some of the wires plugged into the Apex might not reach all the way to the Apex. Sooo, did some checking, everything would reach the Apex, I decided to put the Control Panel on the left side of the tank stand instead of at the front of the tank stand, in front of the Top Off tank. Wife leaves for work, I am 2 hours into cutting my boards and painting them, painting pretty much takes all day to get 3 or 4 coats of paint on the boards. In the mean time, I am taking down the Apex, Top Off tank controls, Gaming box and removing the boards they were mounted to. Around midday I am ready to start mounting the boards and then my Alzheimer moment went away, I realized why I didn't want to put the Control Panel on the side of the stand. Above and behind my Top Off Tank is a shelf where I mounted my dosing pump, I don't use it yet, but its sitting there on the shelf. Behind the Top Off Tank and below the dosing pump shelf is where my three one gallon jugs will set to feed the dosing pump, they aren't there yet, but that's where they will go. If I put the Control Panel on the side of the stand, I can't get the jugs out, felt like an idiot forgetting about that. I was getting down to the last of my wood and most of it had been cut to go on the side of the stand, which is a smaller area than the front of the Top Off tank. I made do though and got the boards repainted and mounted. l also got the cable trays cut and mounted and all of the equipment mounted. The wires are still all over the place, ran out of energy, so that's for another day.